×

TREATMENT



Following the installation, some steps have to be made, in order to ensure the conservation of the floor. After grouting, wait until the floor is completely dry. Then, make a light and dry sandpapering of the floor using a machine with 90-grit sandpaper for removing defects in laying and an oxidation. After this initial sanding, go on with washing with buffered acid to remove efflorescences and then rinse with water only. After one week at least, and with completely dry floor proceed with laying of two coats of raw linseed oil and one coat of paste wax. then, remove with a felt the excess wax on the surface and lay a coat of liquid wax for maintenance. After 2 or 3 days the floor is perfectly walkable. For maintenance, after normal cleaning with detergent and water, apply a coat of liquid wax diluted. This should be done only if required to prevent stratification of wax.

iscriviti alla nostra Newsletter

Email *
Dichiaro di aver letto la Privacy Policy ed autorizzo al trattamento dei miei dati

Floors made bit by bit according the unchanged rules of mixing, moulding and baking in a Hoffman oven.
Passionate research and careful study allow to Fornace Polirone to make repairs and reconstructions of ancient and historical floorings.
Fornace Polirone di Cappelli, Pasqualini e C. S.n.c.
via Fornace, 6/8 - 46034 Borgoforte di Borgo Virgilio (MN)
Tel. 0376.648612 - Fax. 0376.648677
www.fornacepolirone.it
info@fornacepolirone.it
Partita IVA 01296720202

Privacy Policy
Cookie Policy

   
POLIRONE FRANCE
Francis Murat
Tel. 0033 06.62.85.12.86
polirone-france@orange.fr